FOR SALE:
📌LOCATION WESTLANDS
1-bedroom bedroom (60sqm, 6.45sqft) from KSH 6,500,000
1- bedroom (75 sqm, 808 sqft) – from KSH 8,000,000
2 – bedroom type 1 (95 sqm 1023 sq ft) – from KSH 10,000,000
2-bedroom type 2 (95 sqm 1023 sq ft) – from KSH 10,000,000
This project exemplifies a commitment to top-tier construction standards transforming the designated area into a contemporary, upscale apartment complex enriched with comprehensive amenities and a visually stunning environment.
Investors can anticipate not only attractive rental returns but also long-term appreciation in property value
This project exemplifies a commitment to top-tier construction standards transforming the designated area into a contemporary, upscale apartment complex enriched with comprehensive amenities and a visually stunning environment.
Investors can anticipate not only attractive rental returns but also long-term appreciation in property value
This project exemplifies a commitment to top-tier construction standards transforming the designated area into a contemporary, upscale apartment complex enriched with comprehensive amenities and a visually stunning environment.
Investors can anticipate not only attractive rental returns but also long-term appreciation in property value
The first one bedroom apartment is connected to a super large balcony to enable maximal lighting and stunning view for the unit,however the one bedroom apartment with a large study room design,living room with a master bedroom are connected to a luxury long balcony to enable maximal lighting and a stunning view.
The second type which is a 2 bedroom apartment has two balconies design,master bedroom en-suite living room and master bedroom are both connected to the balcony.
AMENITIES
♦️swimming pool
♦️Fully equipped gym
♦️kids play area
♦️Zen garden
♦️Back-up generator
♦️borehole power supply
♦️CCTV surveillance
♦️24/7 Manned security
♦️Access control facilities for the management staffs
♦️Intercom
PAYMENT PLAN
20% initial installments
80% payable on installments up until completion
ESTIMATED COMPLETION DATE DECEMBER 2025